logo
products

High Quality Powder Coat Curing Tunnel Oven

Basic Information
Place of Origin: Guangdong
Brand Name: ABD
Price: Negotiate
Packaging Details: Packed in parts and loaded into the container
Supply Ability: 30 Set/Sets per Month
Detail Information
Type: Coating Production Line Substrate: Steel
Condition: New Machine Type: Curing Oven, Spray Booths, Plc Controller Programmable Logic Controller, Conveying Equipment, Drying Oven, Curing Oven, Coating Equipment
Video Outgoing-inspection: Provided Machinery Test Report: Provided
Marketing Type: New Product 2021 Warranty Of Core Components: 1 Year
Core Components: PLC, Motor Power: Multi Power
Dimension(L*W*H): According To Your Needs Warranty: 1 Year
Applicable Industries: Building Material Shops, Machinery Repair Shops, Manufacturing Plant, Farms, Home Use, Retail, Construction Works Showroom Location: Egypt, Canada, Turkey, United Kingdom, United States, Italy, France, Germany, Viet Nam, Philippines, Brazil, Peru, Saudi Arabia, Indonesia, Pakistan, Mexico, Russia, Spain, Thailand, Kenya, Argentina, South Korea, Chile, UAE, Colombia, Algeria, Sri Lanka,
After-sales Service Provided: Engineers Available To Service Machinery Overseas Wall Panel: Rock Wool Steel Board,150 Mm Thick,anti-flame And Heat-insulation
Control System: Process Setting System:could Set Baking Temperature Etc Car Powder Curing Furnace: Metal Doors Powder Heating Machine
Highlight:

Curing Tunnel Oven

,

Powder Coat Curing Tunnel Oven

,

High Quality Curing Tunnel Oven


Product Description

 

  High Quality Powder Coat  Curing Tunnel Oven

 

Product Description

 

Powder coating oven
Outside Size 3500 x 2700 x 3000mm(LXWXH)
Inside Size  3200x 2400 x 2700mm(LXWXH);
Wall panel Rock wool steel board,150 mm thick,anti-flame and heat-insulation
Heating system OPTION 1 1set of Riello FS20 natural gas burner,200000Kcal/h
stainless steel heat exchanger,max temp:220 ℃, heating time: 20-25 min (180-220℃).
Circulation fans:1 set 3.0kw high-temperatute resisting fan,air flow capacity:3000m3/h.Fan and burner box inner is 2 mm thick galvanized steel,interlayer 150mm thick rock wool,out is 1.2mm thick galvanized steel to keep heat
Control system  Temperature alarm(With inductor in the oven) ,stop button,process setting system:could set baking time and temperature,when baking time arrive,stop automaticly
Total power 3kw


 Powder coating oven with track rail:

High Quality Powder Coat  Curing Tunnel Oven 0

 

 

Powder coating oven components:         

High Quality Powder Coat  Curing Tunnel Oven 1

 

 
Our Services

 

Customization of powder coating line

Before customized design for your painting line, there are some points needing your confirmation:
1).  What's the size (L*W*H) of your workshop for this painting line?
2). What's the shape, size(L*W*H), weight of parts to be painted? Could you please send

     me some pictures of the parts?
3). How many parts to be painted in a working day (8hours)?
4). Is there any oil or rust on the surface of the parts? If yes, how about the amount?
5). How many times do you want to paint such parts?
6). What's your desired heating source for baking the paint, diesel, natural gas or electric? 
7). How about the electric voltage and frequency in your palce?

Why Choose Colin 

1. Provide professional person to communicate with you before the order.
2. Provide powder coating line with advanced technology, exquisite workmanship, 

    top design.

3. Provide strict quality check for each part, each process before export.  
4. Provide optimum system solution based on each client’s specific requirement and 

    local location’s weather condition. 
5. Provide complete post-sale service, including installation, technical guide and training.

Packaging & Shipping

 

FAQ

 

1.What payment do you accept?

Irrevocable L/C at sight and T/T.

 

2.What is your payment terms?

30% T/T deposit, 70% T/T or irrevocable L/C at sight before shipping.

 

3.How long will you need for producing the products?

Usually we will start purchase raw materials after receiving the deposit and start producing, normally will need 30-35 working days.

 

4.What is your main products?

Our main products are powder coating line, powder coating booth(manual type and automatic type), powder coating oven, pretreatment system, water curtain booth etc.

 

5.Can you install for us?

Sure, we have a experienced and professional overseas installation engineer team at your service.

Related Products

 

 

High Quality Powder Coat  Curing Tunnel Oven 2

     Powder Coating Line              Manual Powder Coating Booth      Automatic Powder Coating Booth

High Quality Powder Coat  Curing Tunnel Oven 3

 

 

Contact Details
fsabd

Phone Number : +8613392795330

WhatsAPP : +8615976674725