Type: | Coating Production Line | Substrate: | Stainless Steel Board/Galvanized Sheet |
---|---|---|---|
Condition: | New | Machine Type: | Coating Production Line |
Video Outgoing-inspection: | Provided | Machinery Test Report: | Provided |
Marketing Type: | Hot Product 2019 | Warranty Of Core Components: | 1 Year |
Core Components: | PLC | Coating: | Powder Coating |
Voltage: | 380V/220V | Power: | 50W |
Dimension(L*W*H): | Customized As Customer's Maximum Workpiece | Warranty: | 1 Year |
Key Selling Points: | Engineer Onsite Installation | Applicable Industries: | Building Material Shops, Manufacturing Plant, Construction Works , Energy & Mining |
Showroom Location: | Egypt, United States, Viet Nam, Russia, Thailand, UAE, Australia | Weight (KG): | 20000 |
After-sales Service Provided: | Engineers Available To Service Machinery Overseas | Pre-treatment: | Chemical Pre-treatment Or Sand/shot Blasting Machine |
Water Curing Off Oven: | For Baking Water | Material Of Powder Coating Booth: | Galvanized Cold Sheet/PP Panel/Stainless Steel Sheet |
Powder Coating Oven: | For Baking Powder After Painting | The Heating Fuel Of Oven: | Gas/Diesel/LPG/ Electric |
Evironmental: | Protective | Powder Recovery Capacity: | 98% |
Control System: | Electric Panel | The Conveyor Chain Speed: | Considering Your Capacity |
Highlight: | ABD Powder Coating Production Line,Car Wheels Powder Coating Production Line,ABD Metal Powder Coating Line |
Electrostatic powder coating assembly line for metal doors/white goods/car wheels/steel furniture
The process of powder coating line mainly includes :
Manual powder coating line and Automatic powder coating line.
One full automatic line mainly include four parts: Pretreatment+water drying oven+powder coating booth+powder curing oven
Pre-treatment:
If you need to clean workpiece,we can manufacture pretreatment for you,if there are too much rust on the workpiece,you should use sand blasting or shot blasting.
If there is not too much rust,you can use spray/dip pre-treatment,the process generally includes phosphating-water rinsing-degreasing-water rinsing,(according to different workpiece and requirment,we will produce pre-treatment according to your request).
1. What should we provide if interested in your equipment ?
A.The material/size(max)/weight(max)of your workpieces.
B.What is the expected output of this equipment (8 hours/day,or 30 days/per month )?
C.The available workshop space which you plan to place this set of equipment(in LxWxH) ?
D.What fuel do you prefer to use for heating system:Electric,Gas,LPG,Diesel or others?
2.How to install equipment after purchasing your equipment ?
A,We will provide installation documents ,3D assembling drawing or installation video to guide the installation work.
B.Our engineer will guide the equipment's installation and debugging on line.
C,We can arrange installers to your factory to guide the installation work if needed,this service is chargeable.
D,After the debugging, will provide complete training and track the equipment's usage regularly.
3. How is your company's after-sales service done?
A.1 year parts warranty, parts mainly include fans,burners,electric components of control cabinet,metal structure,wall panels etc,except the case of man-made damage.
B. As long as you have been using our equipment, our technical support will always be online.